Active Transport Footpaths

Overview

Tamworth’s Active Transport Strategy, a key part of the Tamworth Integrated Transport Masterplan within Blueprint 100, aims to make it easier for more local residents to walk or cycle around the city. New footpaths and pram ramps are being constructed at a range of locations across Tamworth to make it easier for residents to walk or cycle.  The locations for the paths have been identified to enable residents to walk or cycle between schools or other community facilities.  

Funding

The project was made possible by the NSW Government’s “Get NSW Active” program. Funding for the footpaths totals $1,318,250.

Footpath locations 

Anthony Road, South Tamworth

A 1.5m wide footpath will be constructed on the north side of Anthony Road, between Woodward Avenue and Petra Avenue.

map that shows the future footpath location along Anthony Road, South Tamworth  

Robyn Street, South Tamworth

A 1.5m wide footpath will be constructed on the north side of Robyn Street, between Jean Street and Kathleen Street.

map that shows the future footpath location along Robyn Street, South Tamworth

Park Street, West Tamworth

A 1.5m wide footpath will be constructed on the south side of Park Street, between Belmore Street and Phillip Street.

map that shows the future footpath location along Park Street, South Tamworth

Garden Street (North), South Tamworth

A 1.5m wide footpath will be constructed on both sides of Garden Street, between Robert Street and Kent Street.

map that shows the future footpath location along Garden Street, between Robert Street and Kent Street, South Tamworth

Garden Street (South), Hillvue

A 1.5m wide footpath will be constructed on the west side of Garden Street commencing at Hillvue Road and travelling south, terminating at the end of the street.

map that shows the future footpath location along Garden Street, near Hillvue Road, South Tamworth

Murray Street (East), Tamworth 

A 1.5m wide footpath will be constructed on the east side of Murray Street, between Peel Street and Marius Street.

map that shows the future footpath location along Murray St,  Tamworth

Murray Street (West), Tamworth 

A 1.5m wide footpath will be constructed on the west side of Murray Street between Byrnes Avenue and Marius Street.

map that shows the future footpath location along Murray St,  Tamworth

North Street, North Tamworth 

A 1.5m wide footpath will be constructed on the north side of North Street between Bligh Street and Bourke Street. The path will cross through the park and then move to the South side of the street between Darling Street and Bourke Street.

map that shows the future footpath location along North Street, North Tamworth

Thibault Street, South Tamworth 

A 2.5m wide shared path for pedestrians and cyclists will be constructed on the south side of Thibault Street between the Levee exit and Goonoo Goonoo Road.

map that shows the future footpath location along Thibault Street, South Tamworth

Pram and kerb ramp construction

A number of kerb and pram ramps will be constructed at various locations across North Tamworth, East Tamworth, South Tamworth, West Tamworth and Oxley Vale.

map that shows the future pram ramp locations across Tamworth