Changed traffic conditions - Namoi River Road
Users of Namoi River Road are advised that works will be taking place over the next fortnight at three sites on the road.
Works will take place between 7am to 4pm from 13 November to 24 November.
When departing from Arthur Street, Manilla, the sites are located as follows (see map below), with work sites stretching from 500m to 1.5km in length.
Site 1 - 1km, Site 2 - 3.5km, Site 3 – 7.5km.

One lane of traffic will remain open at all times, with controls in place.
Please drive with care in changed road conditions.